Day Wireless e-News

Sign-up Now and Save

In Building Services

Day Wireless Systems has years of experience designing in-building system enhancements as well as wide area radio systems for public safety. We are equipped to handle all aspects of emergency responder system enhancement including:

Site Inspection

Although most ordinances only require testing on newly constructed or modified buildings, the safety of our first responders should always be a priority. Our qualified technicians can provide a two way coverage test on existing buildings, and also provide acceptance testing on installed BDA systems.

Wireless System Design

When implementing in-building wireless enhancements, it is crucial to consider long term system stability and not just short term coverage enhancements. Improperly designed systems have the ability to incapacitate a public safety radio system, completely nullifying any benefit of installing a BDA in the first place.

Running a BDA “Hot”
Using low-grade equipment has a tendency to need to be “turned up”; an overpowered in building amplifier causes a time delayed signal to interfere with coverage just outside the building. Improperly designed systems often create interference when the outdoor antenna can “hear” the indoor antenna, creating a loop similar to placing a microphone in front of a speaker.

Running a BDA too “Cold”
An underpowered or unbalanced system can also be a problem when acceptable coverage is not achieved.

Noise Filtering
Each enhancement has the potential of creating an electronic “hum” that can cause fringe coverage to become non-coverage. As more and more improperly designed in-building enhancements are added to a system, the total usable coverage area will shrink.

FCC Licensing

FCC requirements can be complicated and confusing when it comes to in-building systems. All signal boosters require FCC certification prior to installation, including FCC47CFR 90.219. Day Wireless Systems has expertise with FCC requirements in regards to BDA systems, and can explain your rights, the rules, and regulations for system enhancements.

System Installation

Proper installation is the key to a successful BDA deployment. Most city ordinances require FCC General Radio Operators Licenses (GROL) as well as manufacturer certification in order to install the equipment.

Maintenance

BDA systems need to be inspected and tested annually for proof of compliance with the fire code. Our trained technicians will make sure the BDA is operational at all times.

Speak to a Consultant

To request free consultation by phone, call 800-503-3433

Consultants are available
Mon-Fri 8:00 AM - 5:00 PM PST

View our Locations:

Washington

Oregon

California
  Bookmark and Share