Day Wireless Cell Tower Construction Video

The Day Wireless – Oregon tower construction crew recently installed this 100 ft monopole which will provide Verizon 4G coverage in Estacada, OR.

Interesting facts:

  • There are 56 inches of overlap between the two tower sections
  • The tower sections will settle down another foot over time
  • The tower weighs 14,000 lbs

Contact us for your Tower Construction needs including tower site construction from drawing board to field of operations, civil site construction, and equipment installation.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>